BIOARC Insights Hub
Open knowledge repository of the BIOARC project
Publications
BIOARC: Bioregional Bio-Mineral Materials
Thora Hafdis Arnardottir, Edward Jones, Ege Savas, Jamie Haystead, Öykü Tok, Martyn Dade-Robertson, Meng Zhang (UNN, Cresco, TUM)
Conference demo: Biotechnology Design (Cambridge University Press), Vol. 4, e21, 2026
Published; open access (CC BY 4.0)
Presents BIOARC’s approach to turning rice, wheat, sunflower and hop residues into construction materials through microbial mineralisation.
Rice, Microbes and Minerals: Biomineralised Rice Husk Fiberboards for the Built Environment
Thora Arnardottir, Jamie Haystead, Edward Jones, Ege Savas, Naeem Adibi, Giovanni Pesce, Martyn Dade-Robertson, Meng Zhang (UNN, Cresco, WeLOOP)
Conference paper: ICSA 2027, Lecture Notes in Civil Engineering (Springer).
Explores how rice husk fibreboards bound by microbial mineralisation could serve as materials for a circular built environment.
Status: abstract accepted, expected in 2027.
Öykü Tok, Niklas Fanelsa, Julia Ihls (TUM)
Conference paper: Proceedings of the CiD Conference “Circular Design for Urban Transformation”, Hannover.
Examines the gaps between bioregional approaches and industrial practice that hold back the adoption of bio-based building materials.
Status: submitted, expected in 2027.
Public Deliverables
D1.1: Project Management Plan (PMP)
This report (PMP) includes the definition of management processes, communication lines, risk management and (quality) review procedures as well as conflict resolution. The main objective of the PMP is to act as an instructive reference document and a management tool for the BIOARC partners. It further defines concrete responsibilities and decision making processes and describes organizational structures to ensure and steer a smooth implementation of the project and therewith contribute to the overall objectives of BIOARC. The PMP includes a Gantt chart and a Work Breakdown Structure, schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks. Deliverable D1.1 is linked to tasks: T1.1, T1.2, T1.3 and T1.4.
Downloadable soon
D1.2: Data Management Plan (DMP)
The purpose of this plan (DMP) is to define methodology, processes and standards that apply to the handling of data (sets) in compliance with FAIR data management principles (findable, accessible, interoperable and re-usable). The document includes an analysis on how data relates to the project objectives and WP structure, identifying how data will be collected, stored and made available internally (for further processing by project partners) and externally (exploitation, verification, re-use) in full accordance with the FAIR principles. Deliverable D1.2 is linked to Task T1.4.
Downloadable soon
D1.3: Update on D1.1 Project Management Plan (PMP)
The purpose of the report is to give an update of the PMP (D1.3). Deliverable D1.3 is linked to tasks T1.1, T1.2 and T1.3.
Downloadable soon
D7.1: Material and Product Recommendations
This report provides detailed recommendations for the use of the developed bio-based materials, including optimal applications, performance evaluations, and suggested integration into existing construction practices. It highlights how these materials address current industry challenges and support circular economy goals. The output is a detailed document outlining optimal applications, regulatory considerations, and integration strategies. It is derived from Task 7.1 (Market and Regulatory Analysis). It relates to findings from WP2 (material research) and WP4 (testing and validation). The audience are architects, construction engineers, policymakers, and product developers. Success is measured by its relevance to industry needs, adoption of recommendations by stakeholders, and alignment with regulatory frameworks.
Downloadable soon
D8.2: Report on DEC and networking activities
This comprehensive report includes details on dissemination, exploitation, communication activities (DEC), as well as project networking activities, participant engagement, and the impact of these interactions. The report has two iterations, in months 18 and 36. It also includes any changes and additions to the initial DEC Plan (which is not a public report), which may have been adopted in order to adapt to the project activities. Related task: T8.1 (Dissemination, Exploitation and Communication Plan). Activities of the Task T8.2 (Public Outreach and Use-Case Specific Promotional Campaigns) are tailored according to the strategies from this deliverable.